Ironground
a new machine finished concrete floor inside a framed garage, poured by Ironground
Residential concrete

Garage and basement floors

Winter is for the inside. Garage and basement floors, broken out and poured new, done before spring.

A garage floor takes more abuse than any slab on the property. Salt and slush off the car all winter, the weight of the car every day, and usually a base that was never built for any of it. A basement floor is the opposite problem: nobody looks at it until they want to finish the basement, and then it turns out to be thin, cracked or sloping the wrong way.

Both are inside jobs, which means frost does not stop them. We break out the old floor, fix what is underneath it, and pour a new one, through the winter while the outside work waits for spring.

When a floor needs to come out

Not every crack means a new floor. Hairline cracks in an old slab are normal and a patch or a sealer is often the honest answer. A floor needs to come out when sections have heaved or sunk, when cracks keep opening wider every year, when the slab has pulled away from the walls, or when water sits in the middle of the garage instead of running to the door or the drain.

We tell you which one you have at the site visit. If it can be fixed, we will say so.

How we replace a garage floor

The old slab gets broken out and hauled away. Then we look at what it was sitting on, because a floor that failed usually failed from the bottom. The base gets rebuilt and compacted, and the new slab is set to slope to the door or to the floor drain so water leaves instead of sitting.

Then we place and finish it, and tell you the day you can park on it. Parking on it early is the most common way a new garage floor gets damaged, so that date is written down, not guessed.

Basement floors

In a basement the job is access. Everything comes in and out through a door or a window, so we plan the break out and the pour around how material can actually get in and out of the house before anything gets touched.

If the basement is being finished, the floor is the moment to get everything under it right: drains, plumbing rough ins, and insulation and a vapour barrier under the new slab. We plan the floor around the rest of the work so nothing gets torn up later.

The whole renovation, not just the floor

We started in concrete, but we are a general contractor and we run full interior renovations. If the floor is the first step of finishing a basement or rebuilding a garage, we can take the whole job: the floor, the framing, the trades and the finishes, planned as one project with one firm price and one project lead.

One team running it is what keeps the order right. The floor goes in knowing where the walls, the drains and the bathroom will be, instead of being poured first and cut up later.

Why winter works

Outside work in Ontario stops when the ground freezes. Inside work does not, which is why winter is when garages and basements get done. You get the floor finished, and your spring calendar stays free for the outside projects.

An unheated garage in January is still cold enough to hurt fresh concrete, so we heat and protect the space before and after the pour, following the same cold weather rules we use outside (CSA A23.1).

What changes the price

We do not publish rates, and here is why.

A number off a website is a guess, and guesses turn into surprises on the invoice. Every job is priced to what is actually in front of us. These are the things that move it:

  • ·The size of the floor and how much of the old slab comes out.
  • ·What is under the old floor, and how much base has to be rebuilt.
  • ·Access: a garage door, or a basement door or window.
  • ·Drains, slope and anything that has to go in under the slab.
  • ·Insulation and a vapour barrier, if the basement is being finished.
  • ·Heat and protection for a winter pour.

The site visit is free. The quote comes back itemized, with the HST and the total including HST shown, inside 48 hours. What you sign is what you pay.

Common questions
Can you pour a garage floor in the winter?+

Yes. We heat and protect the garage before and after the pour so the concrete cures properly, following the same cold weather rules we use on outside work (CSA A23.1).

Can the cracks be fixed instead of replacing the floor?+

Sometimes. Hairline cracks in an old slab are normal and often only need a patch or a sealer. If sections have heaved, sunk or keep opening up, the floor needs to come out. We tell you which one at the site visit.

Do we have to empty the garage or basement?+

Yes, the floor has to be clear before we start. We give you the dates in writing so you can plan around them.

Do you do the rest of the renovation?+

Yes. We are a general contractor and run full interior renovations, so the floor, the framing, the trades and the finishes can be one project with one price and one project lead.

When can we park on the new garage floor?+

We give you the date when the floor is poured. It depends on the mix and the temperature, and parking on it early is the most common way a new floor gets damaged.

Recent work

Poured this season.

Real jobs, real photos. Nothing on this page is a render.

a new broom finished concrete driveway and front porch poured by Ironground on Gregg Court, Kitchener
HomeownersIronground project
the old broken concrete torn out at Gregg Court before the new pour
Before

Gregg Court

Kitchener
Scope.
Old concrete broken out and hauled, base rebuilt, new front porch and a full width driveway.
Result.
Formed, poured and broom finished by our team. A complete front entrance transformation.
a broom finished concrete front walkway poured by Ironground on Tait Street, Cambridge
HomeownersIronground project

Tait Street

Cambridge
Scope.
Two pours at one property: a front walkway from the sidewalk to the steps, and the driveway beside it.
Result.
Straight, clean broom finish with sawn control joints, tied into the existing steps.
a stamped concrete back patio poured by Ironground at Havendale Place, Waterloo
HomeownersIronground project

Havendale Place

Waterloo
Scope.
Stamped back patio, shed pad, side walkway and front steps.
Result.
Four pieces of flatwork at one home, stamped and broom finishes matched to the property.
a large ashlar-pattern stamped concrete patio running off a rear deck
HomeownersIronground project

Stamped patio

Kitchener
Scope.
Formed, placed and stamped patio with integrated walkway.
Result.
Largest residential finish job of the season. Formed to the shape of the yard and sealed before we left.
a radiused broom finished concrete walkway wrapping a house in Arthur, poured by Ironground
HomeownersIronground project
the side yard in Arthur before the walkway was poured
Before

Wraparound walkway

Arthur
Scope.
A walkway from the rear deck stairs wrapping the foundation, plus window well replacement.
Result.
Radiused around the garden bed instead of hard corners, broom finished for grip.
freshly finished cast-in-place concrete steps and landing at a church entrance
HomeownersIronground project
the same church entrance formed and prepped, ready to place
Before

Cast-in-place steps, Galt church

Cambridge
Scope.
Full tear out and rebuild of the front entrance steps. Formed risers and treads to code geometry, broom finish.
Result.
Institutional client, completed July 2026.
a freshly poured broom finished backyard concrete slab in Cambridge by Ironground
HomeownersIronground project

Backyard slab

Cambridge
Scope.
Site prep, forming, placement and broom finish for a complete backyard concrete installation.
Result.
A clean, durable backyard surface, formed square to the fence lines.
a new poured concrete front porch slab in Paris, Ontario, by Ironground
HomeownersIronground project

Front porch

Paris
Scope.
New poured concrete slab at the front entrance.
Result.
Finished for a clean look and long lasting protection.
an excavator digging the footing trench for a home addition
HomeownersIronground project

Home addition foundation

Southgate
Scope.
Excavation, site prep and cast-in-place foundation for a 2,000 square foot home addition. Footings, frost walls and backfill.
Result.
Dug, formed and built by our team. Framer on the deck with no rework.
Free site visit

Tell us about your project

Three quick questions. Colin calls you back fast to book your free site visit.

  • ✓ $10M insured
  • ✓ Owner-run, talk to Colin
  • ✓ Free site visit
  • ✓ Kitchener-Waterloo
Step 1 of 2